Thermal Disinfectors
Back
HYG 3
HYG 5
AccesoriesService tabs (30 pieces)Thermo tabs (50 pieces)Flexio adapter for ZEG tips
Water Treatment
Back
Reverse osmosis system
Filter candle reverse osmosis WaterPlus
WaterPlus full demineralization filter candle
Full desalination
WaterDemin 550
Replacement filter cartridge for WaterDemin 550
Further Products
Support
Back
Instructions
Video instructions
Downloads
Hygiene lexicon
Printer software
Online test for device instruction
Service form
About Us
Your Cart is Empty!
Back to overview
Installation Qualification (IQ)
Installation qualification (IQ) is the first step of the validation process. It demonstrates and documents that a device has been supplied according to its specification and correctly installed.
It checks, for example:
- whether the device, accessories and documents are complete
- whether the electrical, water and drain connections meet the manufacturer’s specifications
- whether the water quality, e.g. of the demineralised water, is suitable
- whether the installation site is suitable
Only then do operational qualification (OQ) and performance qualification (PQ) follow. For the HYG, the connections include a socket with a separate fuse, a water connection and a drain connection.
Related terms: Validation process · Operational qualification (OQ) · Performance qualification (PQ)
